AvailabilityApproximately
14 - 30 day(s) from the order. The reliability of the estimation is good.
Detailed availabilityNotify me when this product is in stock again
Reviews
Product description —
Show original Annual visual inspection of tanks
We perform a visual inspection of the tanks on site in Konala.
The visual check includes opening the valve, changing the O-ring if necessary, checking and evaluating the inner surfaces of the tank. Removal of the bottom protection and general assessment of the condition of the tank.
CommentsAdd a comment